263云通信企业版登陆:请帮忙翻译一下下面这段话
According to the 2005/2006 project implementation plan, the following works have been achieved, including siting, reconnaissance, and authorization of 19 Toilets in the environment subpoject(stage one); materials preparation, annoucement, presence to government for site requisition and residence removement; preliminary engineering design.
According to the project plan of 2005 and 2006, topograpfy of 19 public lavatories of 1st Stage of Huanweizi Project, application of planning land use permission certificate, locating the planning address, land impressment, investigation, arrangement, pubilicizing of housebreaking and migrating, and reporting to the leadership by level have been completed, and the elementary designing wotk of the project has been set about.
According to the 2005 of item and puts in 2006 into practice plan, complete the wreath 卫 son a geography for first period engineering 19 公s 厕 programming choosing 址 ( fixed-point) survey and map with program to carry out with a ground of permits, completing the programming chooses the 址 , land takes over and dismantles the inquisition sorting, 公 that move waits the material to show to report to wait the procedure with the 逐 class, and have begun to open the exhibition engineering first step design work.